Fulham Road SW6
The Project
AC Design Solution was appointed to a 50-room aparthotel project on Fulham Road after problems had emerged in the earlier work. The developing scheme differed from the approved plans, planning permission had lapsed and water was entering the double basement.
The brief combined a review of the planning position with reinforced-concrete frame and basement issues. Existing design information and site conditions had to be examined together.
Structural Engineering
The structural scope concerned the reinforced-concrete frame and double-basement construction. Water ingress was a central site issue, alongside the need to reconcile the construction information with the planning design.
Project Outcome