Do i need permission to build an outbuilding shed or office in my garden

At a glance

Most garden sheds, garages and garden buildings don't need planning permission under permitted development rights. However, you must follow strict rules: maximum 50% garden coverage including all outbuildings, maximum height of 4m for dual-pitch roofs or 3m for other roofs, maximum 2.5m high if within 2m of any boundary, day use only with no sleeping or toilet facilities, and single storey only. You DO need planning permission for listed buildings (any outbuilding), some restrictions in conservation areas, buildings over the size and height limits, anything forward of your house front, or buildings used for sleeping or independent living. If planning permission is required, expect costs of £528 application fee plus £800-£1,500 for drawings.

Written by Creative Director & Senior Architectural Technologist
Published
Estimated reading time 1 min read
Outbuilding london planning permission
Article guide

What you’ll find here

Jump directly to the part of the guide that matters to your project.

Do you need planning permission to build a shed? What about a garage? Or garden office?

This is the question I get asked most.

Many homeowners want extra space. They build a garden structure. But then problems happen.

What problems?

  • They add a toilet
  • They build too high
  • They use the garden building for sleeping

Here’s the answer: You can build in your garden. But you must follow rules.

Do you need planning permission? It depends on:

  • How big it is
  • Where you put it
  • What you use it for

I will explain these planning permission rules. Step by step.

Do I Need Planning Permission for a Shed?

Most garden sheds fall under permitted development rights. This means you won’t need formal planning permission. But you can’t build anything anywhere.

The key is knowing the difference. What’s allowed? What needs an application? AC Design Solution has helped thousands of London homeowners with these rules. We’ll show you what you need to know.

Planning Permission for My Garden: Understanding Shed Planning Permission

You can build your shed or garden building without the need for planning permission. But only if it Permitted Development rules apply to your house

These rules are not suggestions. They are legal rules. The local planning department checks them.

Real example: We helped a client in Ealing. They built a shed. It was 3.5 metres high. It was within 1 metre of their boundary. This was wrong.

What happened? The planning department said no. They had to rebuild it. It cost thousands of pounds.

Permitted Development Outbuildings

Permitted development is your legal right. You can make some changes to your property. You don’t need to apply for planning permission. This covers most garden structures. But only when they meet size, height, and location limits.

Permitted development is fast and cheap. No planning fees. No waiting for approval. No risk of rejection. But go outside these limits? You’ll need full planning permission.

Exceptions

Some situations remove your permitted development rights:

Listed buildings – Any outbuilding needs planning permission

Article 4 directions – Your council may have removed permitted development rights in your area

Previous planning conditions – Earlier applications might have limited your rights

Designated land – Conservation areas, National Parks, and Areas of Outstanding Natural Beauty have stricter rules

We check these factors first at AC Design Solution. Always. Before we advise any client.

Do You Need Planning Permission for a Brick Shed?

Short answer: Material doesn’t matter.

Timber, brick, metal, concrete. The same rules apply to all materials.

But here’s something good to know. Brick buildings often signal permanent use. Planning officers might look more closely. They want to check you’re not creating separate living space.

Common mistake: Some clients think matching materials to their house means planning permission is needed. Wrong.

You can build a brick outbuilding under permitted development. Just make sure it meets all other rules.

What is the Maximum Size Garden Building Without Planning Permission?

There’s no single maximum size. Instead, you have three limits working together:

Coverage limit: Max 50% of your original garden area

Height limits: These change based on distance from boundaries

Floor area limits: Different rules apply in protected areas

The 50% rule trips up lots of people. Here’s what it includes:

  • Your new garden building
  • All existing extensions
  • Conservatories
  • All timber garden structures

We work out this total area carefully for every client. Why? To avoid nasty surprises later.

Garden Building Within 1 Metre of Boundary

Wood outbuilding permitted development

Height limits are critical here. Any garden structure within 2 metres of a boundary has limits. Maximum overall height: 2.5 metres.

Important fact: Height gets measured from the highest adjacent ground level. Not from where you dug foundations. Not from added decking.

Appeal case APP/P0119/X/11/2150375 set this rule. Every local planning office follows it strictly. For full details, see the government’s permitted development rights for householders technical guidance.

Other Criteria to Consider Regarding Planning Permission for Your Garden Room

Incidental vs. Ancillary Use

This rule trips up more clients than any other. Your outbuilding must be used for purposes linked to your house. Not ancillary.

What does this mean?

Linked use includes:

  • Storage
  • Hobbies and crafts
  • Home office (day use only)
  • Gym or exercise room

Separate use (this needs planning permission):

  • Sleeping rooms
  • Separate kitchen facilities
  • Independent living space
  • Bathroom or toilet facilities

Add a toilet? You need planning permission. Use it for sleeping? You need planning permission.

Special Considerations

Listed Buildings

Is your property listed? Any grade counts. You’ll need planning permission for any outbuilding. Size doesn’t matter. Location doesn’t matter.

You’ll also need listed building consent. That’s a separate application process.

Designated Land

Some areas have extra limits. These keep local character. Areas include:

  • Conservation Areas
  • National Parks
  • Areas of Outstanding Natural Beauty
  • World Heritage Sites

Extra restrictions apply:

  • Side extensions: Need planning permission
  • 20 metre rule: Buildings more than 20 metres from your house get limited to 10 square metres
  • More checks: Even permitted development gets closer examination

The Most Important Factors Are:

Five key factors decide everything:

  1. Distance from boundaries – This sets height limits
  2. Total coverage – Cannot exceed 50% of original garden
  3. Intended use – Must stay linked to the house
  4. Location – Cannot be forward of your main house front
  5. Design features – No balconies, verandas, or raised platforms

How Much Does Planning Permission Cost?

Your outbuilding doesn’t qualify for permitted development? You’ll need to submit a householder planning application.

Planning fees changed on 1st April 2025. Householder planning application fees went up a lot. Now costs £528 for single dwellinghouse applications.

But that’s just the application fee. You’ll also need:

  • Drawings – £800 to £1,500
  • Planning statement – £500 to £800
  • Maybe extra surveys – Depends on your property

At AC Design Solution, we handle everything. We make sure your application gets approved first time.

How to Apply for Planning Permission for Your Garden Office

Need to apply for planning permission? Here’s the process:

Step 1: Pre-application advice Talk to the planning department first. Discuss your plans.

Step 2: Prepare drawings Get detailed plans. Show the garden building in context.

Step 3: Submit a planning application Include all required documents. Pay the fees.

Step 4: Consultation period 21 days for neighbour comments.

Step 5: Decision Usually takes 8 weeks.

We’re CIAT Chartered Architectural Technologists. We prepare planning permission applications that planning officers want to approve. We focus on how your garden office makes your property better. Not worse.

Outbuildings in Conservation Areas

Conservation areas have extra restrictions. They preserve local character. Even permitted development may need prior approval.

Prior approval means submitting your plans for review. You do this before construction starts.

The planning authority checks:

  • Visual impact on the street scene
  • Effect on neighboring properties
  • Compliance with conservation area guidelines
  • Materials and design fit

Outbuildings in National Parks, AONB, WHS etc.

These designated areas have the strictest controls:

10 square metre limit: Buildings 20+ metres from your house get limited to 10 square metres

No side extensions: Need planning permission

Enhanced design requirements: Even for permitted development

Material restrictions: May need to match local style

Curtilage / Garden Land

Understanding your curtilage matters. It’s crucial for calculating the 50% coverage rule.

Curtilage includes land around your house used for home purposes:

  • Gardens and lawns
  • Driveways and parking areas
  • Domestic outbuildings
  • Vegetable plots

It doesn’t include:

  • Land separated by public roads
  • Agricultural fields or paddocks
  • Land not used for home purposes

Recent court case: Land separate from the main garden doesn’t count as curtilage. Even if the family uses it.

Summary of Limits and Restrictions on Outbuildings

Size and Coverage:

  • Max 50% total coverage of original garden
  • No single size limit
  • But coverage rule applies

Height Restrictions:

  • 4 metres max for dual-pitched roofs
  • 3 metres max for other roof types
  • 2.5 metres max within 2 metres of any boundary
  • 2.5 metres max eaves height

Location Requirements:

  • Not forward of main house front
  • Single-story only
  • No verandas, balconies, or raised platforms

Use Restrictions:

  • Incidental use only
  • No sleeping accommodation
  • No independent living facilities

Legislation for Class E of Part 1

Outbuildings fall under Class E of Part 1. This is part of the General Permitted Development Order.

This law sets out what you can build. No planning permission needed. But only under certain conditions.

The current order is from 2015. It has some changes since then. It’s the legal framework. It covers all permitted development rights for homes.

Removal of Class E Rights for an Outbuilding

Your permitted development rights can be taken away. This happens in several ways:

Article 4 directions: Local authority removes rights

Planning conditions: Previous applications restrict your rights

Designated areas: Special restrictions apply

Listed building status: Your property has heritage protection

Always check with your local planning authority first. Do this before you start building. These restrictions aren’t always obvious.

Maximum Size and Height of an Outbuilding Under Permitted Development

The max size depends on many factors. They work together:

Standard homes:

  • Height: 4m (dual-pitch), 3m (other roofs), 2.5m (within 2m of boundary)
  • Coverage: 50% of original garden
  • Eaves: 2.5m max

Special areas (Conservation Areas, National Parks, etc.):

  • Same height rules
  • Extra 10 square metre limit for buildings 20+ metres from house
  • More design checks

Understanding the Height Requirement

Height measurement is tricky. Most people get this wrong.

Key rule: Height gets measured from the highest adjacent ground level.

Appeal case APP/P0119/X/11/2150375 set this rule.

This means:

  • Digging foundations doesn’t reduce height
  • Adding decking doesn’t help
  • On slopes, use the highest point next to the building
  • Use ground level, not floor level

Building Regulations for Outbuildings

Most outbuildings under 15 square metres don’t need building regulations approval. However, exceptions include: